Today I went with L. for the second apartment viewing. On the first viewing we filled out a form with 10 issues we found in the apartment. The majority of them were small bumps in the wall, or a few were areas where there were imperfections in how the finishing on the doors, or how the doors close. They addressed all of the issues, and we pointed out a few more new ones that we found, but generally things are looking good at the apartment.
We were presented with one major change though: in the living room where the pipe from the air conditioner blower unit to the compressor was supposed to be, it turns out that they could not put the compressor where the initial plans indicated they would be. Instead, the compressor had to be moved to the other side of the room, so the exit pipes were changed to the other side. This is a problem because we plan to have custom built shelving put where there is now an exit pipe, and two access panels for the air conditioning unit. In the end the company that does the custom furniture was able to work around the constraints, but it is kind of annoying.
After the second walk-through we went down and spent a while with the custom furniture people working on the wall cabinetry. I’m very happy with it, and excited to see what it will look like when it is done. I can’t believe how much it costs, but I’m sure it will be worth it. (For that matter, I can’t believe how much the drapes cost either!)
We also had a chance to check out the common facilities at the apartment: the exercise room (looks pretty nice), the two guest rooms (Japanese style and Western style, look very nice), and the library (three study carrels which look very cool – net connections and everything.)
When we finally finished up everything, L., her parents, and myself all went out for an excellent sushi dinner.
Leave a Reply